Skip to content

feat: task comments and English status-journey timeline

Ali YousefNezhad requested to merge feature/timeline-english into dev

Summary

  • Manage tasks – comments: new 💬 افزودن کامنت action; the comment is staged like other edits and posted on ✅ confirm via POST /rest/api/2/issue/{key}/comment. A footer credits the linked admin, since Jira records the PAT account as author.
  • Timeline: always-English, left-to-right "status journey" — summary (current status & time in it, assignee, owner, created, last change, counts, first response) plus one block per status with assignee/owner changes and comments. Each comment shows the wait since the previous activity.
  • Jira: changelog now includes Owner-field changes and all comments (paged via GET /issue/{key}/comment when truncated).
  • Task detail: created and updated dates shown as Jalali Y/m/d H:i in Asia/Tehran.

Testing

  • New unit tests for comments, timeline rendering, owner/comment fetching and dates; they pass.
  • Full suite: no new failures. The 79 failures that already existed come from the missing local telegrambot MySQL database and replyToMessage mock expectations.
  • Pint clean; PHPStan introduces no new errors (with Larastan: 168, previously 169).

🤖 Generated with Claude Code

Merge request reports